FORGED BY YAKKAFORGED FOR WORK. FORGED FOR LIFE.

Training approach

Maintenance Training:
For Busy Weeks and Planning What’s Next

Maintenance training can give you a short, manageable bridge when life gets busy or after you finish a long training block and want a week or two to decide what comes next. You may still want to lift without starting another growth phase straight away. At FBY, the aim is to hold onto what you’ve built with a smaller workload while you consider your next fitness goal.

Why train for maintenance

Building muscle and strength takes repeated work. Keeping those adaptations may require less training than building them did, although the amount varies with the person and the outcome being measured.

In Bickel and colleagues' study, reduced training doses over 32 weeks after initial training preserved earlier muscle growth in younger adults, but not in the older group. That supports the possibility of maintaining with less work, while showing why one universal minimum would be misleading. It does not validate FBY's specific approach. [1]

A short break does not automatically mean starting over. In a small study of young resistance-trained men, leg press strength did not decrease after two weeks without training. That finding does not guarantee every muscle or lift stays unchanged, but it challenges the idea that a short break automatically wipes out your progress. [2]

What we mean by maintenance volume

Here, maintenance volume means the amount of working-set training aimed at retaining existing muscle and strength rather than pushing for more. It describes the job the training is meant to do, not a fixed set count that works for everyone.

Our programming approach is to make the workload smaller while keeping the lifting useful. We favour familiar exercises and meaningful, manageable loads that you can control well. Leave reps in reserve rather than grinding through every set. The week does not need forced increases in weight or reps to count as worthwhile.

Reducing the workload also means resisting the urge to fill every gap. Adding extra exercises, chasing soreness or turning shorter sessions into tests of toughness defeats the point. Warm up for the work ahead, complete the planned training, and leave room for the rest of your day.

Those are FBY programming choices, informed by the broader maintenance idea. Research does not give us a single proven recipe for every lifter, job or busy week.

When it makes sense

A brief maintenance period can suit a busy week or two when you still have gym access but less time or recovery capacity. Think extra shifts, a demanding job deadline, travel with a usable gym, or more responsibilities at home.

Physical work belongs in that decision. A hard day on site can add fatigue, even if it does not replace the balanced resistance training in your program. Judge the gym workload alongside what the rest of your week is asking of you.

Maintenance is an option, not obligatory. If you are ill, injured or dealing with pain, do not use it as a reason to push through. Rest or appropriate professional help may be the better next step. Keep sleep and regular meals on the agenda where you can, too.

How it fits with our programs

Our maintenance options for Heavy Hitters and Muscle Beach Madness offer three-day and four-day versions, selectable like our other programs at signup or later. Each runs for one week, with the option to repeat it once if you need a second week.

A deload has a different main purpose: reducing training stress to manage fatigue within a training cycle. [3] Our maintenance approach is aimed at keeping useful training in place when life temporarily limits what you can do. The two can overlap in practice, but the reason for choosing them matters.

For a longer busy period, Core Elements is the minimalist option to consider rather than repeatedly extending a short maintenance block. A program you can realistically follow for the months ahead needs a different decision from getting through a difficult fortnight.

What happens afterwards

When things settle, look at your available time, how you feel and how your recent sessions went. Resuming your previous program, restarting a block or switching to something that fits better may all be reasonable. You do not need to squeeze missed work into the next week.

The aim is to make the next training decision manageable. Sometimes that means building. Sometimes it means holding ground. A busy fortnight can be planned for without treating it as failure.

References

1. Bickel CS, Cross JM, Bamman MM. Exercise dosing to retain resistance training adaptations in young and older adults. Medicine & Science in Sports & Exercise. 2011;43(7):1177–1187. https://pubmed.ncbi.nlm.nih.gov/21131862/

2. Hwang PS et al. Resistance Training-Induced Elevations in Muscular Strength in Trained Men… Journal of Strength and Conditioning Research. 2017;31(4):869–881. https://pubmed.ncbi.nlm.nih.gov/28328712/

3. Bell L, Strafford BW, Coleman M, Androulakis Korakakis P, Nolan D. Integrating Deloading into Strength and Physique Sports Training Programmes: An International Delphi Consensus Approach. Sports Medicine - Open. 2023;9(1):87. Expert consensus, not a randomized trial. https://pubmed.ncbi.nlm.nih.gov/37730925/